#BathroomRemodel Tracey made a little more progress on the bathroom. After a trip to the attic and some wire splicing there is now a new functioning electric outlet in the bathroom on the wall near where the new sink will be installed.
We also managed to take apart and re-assemble the connections to the shower valve and it doesnt leak this time. (third time is a charm!) All we needed evidently was more thread tape on the connections.
MjL 02 Mar 2015, 5:37 a.m.
#Fresenius Today is the travel day for Tracey to go to Minneapolis for a couple days of meetings with her new boss.
She is a bit ticked off that she will have to make a connecting flight in Chicago. She will have to wait 3.5 hours at the airport between planes.
One of her co-workers insisted they take this flight so it arrives later in the day instead of taking an earlier flight that was a direct flight with no changing of planes. Now that co-worker is sick and is not going. Kind of adds some insult to injury as she will have to sit waiting in Chicago and hope the flight doesnt get canceled because of weather.